PMC: A $250B Industry Standard
Project Management Consultancy is the backbone of the global chemicals sector. APChemi brings this proven discipline to pyrolysis.
Why You Need Specialist PMC for Pyrolysis
Pyrolysis plants are not standard chemical processing facilities. They involve high-temperature reactors, aggressive feedstocks, corrosive vapors, and products that require careful handling. Projects that rely on general contractors without pyrolysis expertise typically face:
- 20-40% cost overruns from design errors discovered during installation
- 6-12 month delays from wrong equipment specifications or rework
- Underperforming plants producing 20-30% less than design capacity
- Safety incidents from improper material selection or missing interlocks
Common challenge areas in pyrolysis projects
APChemi's PMC team has seen every failure mode in pyrolysis plant construction. Our role is to prevent these failures from occurring in your project.
APChemi's Track Record
Transforming Pyrolysis Projects From Concept to Success
- Projects
- 49+
- Years
- 17
- Patents
- 12
- ISCC PLUS plants
- 4
- Kg Processed
- 227M+
- Jobs Created
- 3K+
- Hours Technology
- 1.3M
- Capital Efficiency
- 2-5x
Project Phases
| Phase | Duration | Key Activities | Deliverable |
|---|---|---|---|
| 1. Feasibility & Planning | 4-8 weeks | Techno-economic feasibility, site selection support, feedstock assessment, regulatory review, financial modeling | Bankable feasibility report |
| 2. Technology Selection | 3-6 weeks | Reactor type evaluation, process flow development, capacity optimization, automation level specification | Technology selection report with basis of design |
| 3. Detailed Engineering | 6-12 weeks | P&IDs, equipment specifications, structural design, electrical design, instrumentation, utility planning | Complete engineering package for procurement |
| 4. Procurement | 8-16 weeks | Vendor shortlisting, RFQ preparation, bid evaluation, purchase order management, quality assurance on fabrication | All major equipment on order with QA oversight |
| 5. Construction Supervision | 8-20 weeks | Civil works oversight, equipment installation supervision, piping and electrical verification, safety compliance | Installed plant ready for commissioning |
| 6. Commissioning | 4-8 weeks | Cold commissioning, hot commissioning, performance testing, operator training, process optimization | Operational plant meeting design specifications |
Each phase has defined deliverables and quality gates. APChemi provides regular progress reports and cost tracking throughout the project lifecycle.
Talk to APChemi
Planning a pyrolysis plant project? APChemi's PMC team has delivered 49+ plants across 15+ countries. Get specialist project management that prevents costly errors.
49+ projects12+ patentsISCC PLUS certified
What APChemi Manages
Design & Engineering
- Process design based on actual feedstock test data
- Equipment sizing optimized for your capacity and targets
- Material selection for high-temperature, corrosive service
- Control system specification for safe, automated operation
- Utility requirements and site layout optimization
Procurement & Vendor Management
- Technical bid evaluation — quality, not just price
- Factory acceptance testing for critical components
- Delivery schedule coordination to prevent delays
- Quality assurance during fabrication
Construction & Installation
- Civil and structural works supervision
- Mechanical installation with tolerance verification
- Piping, electrical, and instrumentation checks
- Safety system verification before hot commissioning
Commissioning & Handover
- Systematic cold and hot commissioning
- Performance testing to verify specifications
- Operator training and knowledge transfer
- Operations and maintenance manual delivery
Don't Hire a Consultant. Partner with an Organisation.
APChemi PMC provides full organizational support with deep pyrolysis expertise, a multidisciplinary engineering team, and a proven track record of 49+ plants and 179 million kg processed.
| Aspect | APChemi PMC | Typical Consultant |
|---|---|---|
| Team | Full multidisciplinary engineering organisation | 1-2 individuals |
| Focus | 100% pyrolysis specialisation since 2009 | Generic chemical background |
| Review Depth | Process, mechanical, electrical, controls, safety — all in-house | Surface-level review |
| Track Record | 49+ plants, 227M+ kg processed, 12 patents | Limited pyrolysis experience |
| Expertise | Deep pyrolysis technology, operations, and financial acumen | General project management skills |
| Risk | Organisation-backed guarantee of continuity | Single point of failure |
Choose Your Path to Success
Full PMC
APChemi manages every aspect from feasibility through commissioning — ideal for first-time operators or investors without in-house engineering teams.
Design & Procurement Only
APChemi handles engineering design and procurement while you manage construction — for clients with local construction capability.
Commissioning Support
Specialist pyrolysis commissioning engineers for plants designed by others — expert help getting a plant running to specification.
Owner's Engineer
APChemi acts as your technical representative, reviewing contractor deliverables and protecting the investor's interests throughout the project.
Mix and match our services based on your project's unique needs and timeline.
What does an owner's engineer do on a pyrolysis project? In the video below, Suhas Dixit explains it: the owner sets the key performance indicators, and the owner's engineer turns them into technical requirements and plant controls, so the technology and machinery suppliers deliver the performance the project needs.
Global Project Experience
APChemi has delivered pyrolysis projects across diverse geographies and regulatory environments:
- Europe: Netherlands, UK, Spain, Germany — strict environmental regulations, high automation
- Asia: India, Malaysia, Thailand, Indonesia — cost-optimized designs, local fabrication
- Middle East: UAE, Saudi Arabia — extreme temperature considerations, international procurement
- Africa: Kenya, South Africa — infrastructure-limited sites, containerized solutions
- South America: Brazil, Colombia — feedstock-specific adaptations, local compliance
Regardless of location, APChemi applies the same rigorous project controls and quality standards.
APChemi's multidisciplinary engineering team
PMC Investment & ROI
In line with market norms of the chemicals sector, APChemi's PMC service fee ranges from 2% to 5% of project expenses.
Worked example
ROI in a worked example
For a $3.55M project
Net benefit: $1.2M+
Overcoming Pyrolysis Challenges
Pyrolysis projects face challenges across two critical phases. APChemi's diverse team addresses every one:
1 Project Development Phase
Technology Selection
- Choosing equipment for varied feedstocks
- Balancing cost with reliability
- Corrosion-resistant materials
- Explosion-proof electrical systems
Technology Operation
- Complex chemical processes
- Optimal temperature ranges
- Long-chain hydrocarbon breakdown
- Safety systems for flammable materials
General
- High capital investment
- Permits and environmental standards
- Recruiting skilled personnel
- Market positioning
2 Plant Operations Phase
Technology Scaling
- Process improvements and scale-up
- Upgrading for larger volumes
- Heat recovery systems
- Product quality technologies
Operations
- Maintaining optimal conditions
- Corrosion and fouling issues
- Catalyst management
- Ignition risk management
Business
- Feedstock variability
- ISCC/Verra certification
- Carbon/plastic credits
- 330+ working days uptime
What Clients Achieve with APChemi PMC
- On-time delivery: Structured milestone tracking keeps projects moving — most APChemi-managed projects complete within 10% of planned schedule
- Budget control: Early-stage cost estimation accuracy within 15%, with ongoing cost tracking preventing overruns
- First-pass commissioning success: Plants achieve design capacity during initial commissioning rather than requiring months of troubleshooting
- Regulatory compliance: Environmental permits, safety certifications, and operational licenses secured before operation
- Knowledge transfer: Client teams trained and capable of independent operation within weeks of handover
Calculate Your PMC Value
Use this interactive calculator to see how much value APChemi's PMC creates for your specific project. Adjust the sliders to match your project parameters — results update instantly.
PMC Value Calculator
Interactive tool to quantify value creation through professional PMC services
Project Investment
PMC Fee Structure
$3,550,000 x 5.5% = $195,250
Value Creation Parameters
Industry typical: 10-30% | Value: $355,000
Reduces 60% base risk | Value: $852,000
Based on 5% monthly delay cost | Value: $26,625
First-year improvements | Value: $177,500
Advanced Assumptions
Industry average failure/underperformance rate for pyrolysis projects
Financial impact of each month of project delay
Value Creation Breakdown
Return on Investment Analysis
For every $1 invested in PMC, you receive $7.23 in value
ROI = ($1,215,875 / $195,250) x 100
Key Insights
The Bottom Line
Investing $195,250 in professional PMC services creates $1,411,125 in value, delivering a net benefit of $1,215,875 to your project.
Frequently Asked Questions
APChemi's Project Management Consultancy covers the full project lifecycle: feasibility study, technology selection, plant design, vendor evaluation, procurement support, construction supervision, commissioning, operator training, and post-commissioning performance optimization. The scope is tailored to each client's needs — some engage us from concept through handover, others for specific phases where they need specialist pyrolysis expertise.
In line with market norms of the chemicals sector, APChemi's PMC service fee ranges from 2% to 5% of project expenses. For a $3.5M project, that translates to approximately $70,000–$175,000. The investment delivers measurable returns: up to 30% reduction in CAPEX/OPEX, 40-60% reduction in project failure rates, and 2-5x more capital efficiency.
Yes — APChemi has managed projects across 15+ countries spanning Asia, Europe, Africa, the Middle East, and South America. Our team mobilizes for on-site supervision during critical phases (installation, commissioning) while managing design and procurement remotely. Time-zone overlap and regular video reporting keep communication seamless regardless of location.
General engineering firms lack deep pyrolysis knowledge. APChemi's PMC team consists of engineers who have designed, built, and operated pyrolysis plants — not just managed construction schedules. With 12+ patents and 49+ projects, we catch design flaws before fabrication, understand the nuances of high-temperature reactor installation, and know exactly which equipment suppliers deliver reliable pyrolysis-grade components.
From feasibility study to commissioned plant: 12-24 months is typical. Small plants (5-10 TPD) can be installed in 8-12 months. Medium plants (20-50 TPD) take 14-20 months. Large or custom-engineered plants (50+ TPD) may need 18-30 months. APChemi's PMC service optimizes the timeline by running parallel workstreams and maintaining momentum through procurement and construction phases.
Absolutely. Most pyrolysis project owners fail because they don't have a specialised PMC. While the pyrolysis market is rapidly expanding, it's still a relatively nascent industry with unique complexities. The global PMC market, valued at $250 billion, demonstrates the recognised importance of professional project management. APChemi's focused specialisation in plastic, tire, and biomass pyrolysis makes us uniquely equipped to guide your project to success.
Talk to APChemi
Get a Free Consultation
Tell us about your pyrolysis project and our engineers will get back to you within 24 hours.
49+ projects deliveredISCC PLUS certified17+ years experience